Services
Interior Painting Exterior Painting Roof Painting Waterproofing Damp Proofing Commercial Painting Epoxy Floor Coating Plaster Repairs Feature Walls Spray Painting Wood Staining Ceiling Painting Fence Painting Pool Painting Anti-Rust Coatings Wallpaper Removal School Painting Industrial Painting Factory Painting Warehouse Painting Colour Consulting Kitchen Painting Bathroom Painting Garage Painting Boundary Wall Painting Estate Painting
Areas
Kalk Bay Muizenberg Simon's Town Noordhoek Kommetjie Sun Valley Clovelly Glencairn Lakeside Capri Village
More
Reviews About Contact Get a Quote →

PAINTERS SIMON'S TOWN

Get the best quote, fast

★★★★★5-Star Reviewed
Home › Areas › Painters Simon's Town
Painters in Simon's Town, Cape Town Southern Peninsula
  • Get a free quote with scaffolding on sloped sites costed up front
  • Steel windows, balustrades and gates quoted as a proper rust system, not a coat of enamel over the problem
  • We work the whole strip from Glencairn through to Millers Point, so travel is not padded into your price

What Painting Costs in Simon's Town

Two things set Simon's Town pricing apart. The first is gradient. A large share of the housing stock is built into the slope, which means a wall that is single-storey at the front is three storeys at the back. Scaffolding and edge protection on those elevations is a real cost and any quote that does not mention it has not been to the site.

The second is metal. Steel window frames, balustrades, staircases, gates and railings are everywhere in this town, and in this salt load they are the fastest-failing element on the building. Doing them properly costs more than painting the walls they sit in, and doing them badly means doing them again in eighteen months.

JobBasisTypical range
Exterior repaint, plastered walls, two coatsper m²R95 – R145
Full exterior, single-storey three-bedroomwalls, trim, guttersR35 000 – R60 000
Full exterior, double-storey on a slopeincl. scaffolding and edge protectionR65 000 – R110 000
Steel window frames — strip rust, prime, enamelper frameR650 – R1 400
Balustrades, railings and gates — epoxy systemper running metreR550 – R950
Interior repaint, walls, two coatsper m² of wallR55 – R85
Full interior, three-bedroom homewalls, ceilings, trimR20 000 – R34 000
Roof repaintper m²R130 – R220

Steel that has pitted rather than surface-rusted may need cutting and welding before coating, which is a metalwork cost rather than a painting one. We flag it at survey instead of coating over it. Every figure above is a guide for budgeting. A measured quote after a site visit is what you should actually work from.

When to Paint in Simon's Town

October to April, with a strong preference for the shoulders. Simon's Town is more sheltered from the southeaster than the Atlantic side, but it gets the southwester coming straight up False Bay in autumn and spring, and that is the wind that carries wet salt onto a building.

There is a practical gradient issue too: on steep sites the working day is shorter because scaffolded elevations in shade stay cold and damp longer. On a south-facing back wall in October you may only have five usable hours, which affects how the job is scheduled and priced.

  • October to November — good for north and east elevations. Steep south-facing back walls are still slow to dry.
  • December to February — best for the shaded and sloped elevations that are unworkable earlier in the year. Sunny walls get done early morning.
  • March to April — reliable, calm, ideal for metalwork, which needs a dry surface and stable temperature more than walls do.
  • May to September — interiors and interior joinery. Exterior steel preparation can sometimes be done in a dry winter spell, but the coating should wait.
  • Wind check — a fresh southwester off the bay carries salt spray inland well past the Main Road. Coating in it means coating salt onto the wall.

Which Paint to Use in Simon's Town

This is one of the harshest coastal exposures in Cape Town for metal, and the specification should reflect that. Wall paint choice matters, but the rust system is where a Simon's Town job is won or lost.

  • Mild steel frames, rails and gates — mechanically remove rust to bare metal, then an epoxy mastic or zinc phosphate primer, then a polyurethane or high-build enamel topcoat. Rust converter over pitted steel is a patch, not a system.
  • Galvanised steel — must have an etch or mordant-wash primer first. Enamel applied straight onto galvanising will sheet off in a year.
  • Aluminium frames — degrease, etch prime, then a suitable topcoat. Do not use a standard wall primer.
  • Plastered walls — premium 100% acrylic, Plascon Micatex or Dulux Weathershield grade. Where hairline cracking is present, a flexible bridging coat before the topcoats.
  • Retaining and slope-side walls — check for water pushing through from behind before coating. A retaining wall with no drainage will blow any coating off from the inside.
  • Interiors — standard low-sheen acrylic. Homes built into rock often have one permanently cool wall, which wants a mould-resistant product.
Rust treatment on steel windows in Simon's Town

What We Find on Simon's Town Homes

What surveys in Simon's Town usually turn up:

  • Steel window frames rusted through at the bottom corner, where water collects in the rebate. These need welding or replacement, not paint.
  • Balustrade uprights rusted at the point where they enter the concrete, which is out of sight until it fails.
  • Damp on the uphill wall of a slope-built house, coming from groundwater behind an undrained retaining structure.
  • Coating failure on the bay-facing elevation only, three or four years ahead of the rest of the house.
  • Galvanised gutters and downpipes painted without an etch primer, peeling in sheets.
  • Efflorescence — white powdery deposit — on garage and basement walls cut into the slope.

Services We Cover in Simon's Town

Simon's Town Painting Questions

What will it cost to paint my house in Simon's Town?
A single-storey three-bedroom exterior is generally R35 000 to R60 000. A double-storey on a slope runs R65 000 to R110 000 once scaffolding and edge protection are included. Steel windows are priced separately at roughly R650 to R1 400 a frame, because that is where the real work is.
Why is my steelwork rusting again so quickly?
Almost always because rust was painted over rather than removed. In this salt load, any rust left under the film keeps working and pushes the new coat off. The correct sequence is mechanical removal to bare metal, an epoxy or zinc phosphate primer, then the topcoat.
Is scaffolding really necessary?
On a slope-built house, yes. Ladder work on a three-storey drop is neither safe nor capable of producing an even finish. It is better to see it as a line on the quote than to have it appear as a variation halfway through.
When is the best time of year to paint here?
October to April overall, with March and April the most reliable for metalwork. Avoid days with a fresh southwester off the bay, which carries salt straight onto wet paint regardless of the season.
How long should an exterior last in Simon's Town?
Four to six years on walls with a premium product. Steelwork on a bay-facing elevation should be inspected annually and touched up as needed — catching a small break in the film is far cheaper than a full strip-back later.

Getting a home in Simon's Town painted? Contact Painters Fish Hoek for a free, itemised quote showing the preparation, the number of coats and the actual product going on your walls.

painters Simon's Town, house painting Simons Town, steel window painting Simons Town, anti rust painters False Bay, exterior painters Simons Town, scaffolding painting slope

Get a Free Quote in Simon's Town →

NEED A PAINTER IN SIMON'S TOWN?

Get a free, no-obligation quote today.

Get My Free Quote

5-Star Reviews

Powered by leaderr

A division of Painterr